CQS Solutions played a key role in the refurbishment and redevelopment of Cardigan Market Hall, a historic town centre building that has long served as an important commercial and community asset. Delivered on behalf of the Cardigan Preservation Trust, the project forms part of wider regeneration efforts aimed at strengthening the town centre, supporting local businesses and enhancing community use of the facility.

The redevelopment included the construction of a new access and circulation block, refurbishment of the existing market hall, re-roofing works and a range of internal improvements designed to support modern trading and community activities. New building services and infrastructure were carefully integrated into the historic structure, balancing contemporary requirements with the preservation of the building’s character.

Working within a busy town centre and a historic building presented a number of challenges. The project team had to carefully coordinate construction activities around public access routes and neighbouring businesses while ensuring the sensitive treatment of the existing structure. Utility diversions and stakeholder coordination, including engagement with Welsh Water, also required detailed planning throughout the programme.

Appointed as Quantity Surveyor and Cost Consultant, CQS Solutions provided comprehensive cost consultancy services from procurement through to final account agreement. This included cost planning, tender evaluation, financial reporting, valuation assessments and ongoing commercial management to ensure the project remained aligned with its grant-funded budget framework.

Working closely with the client, contractor and design team, CQS Solutions helped navigate a complex delivery environment while maintaining strong cost control and funding compliance. The completed Market Hall now provides a revitalised destination for traders, visitors and community groups, supporting the long-term regeneration and economic vitality of Cardigan town centre.

What our clients
have to say

We are very satisfied indeed with the consistently excellent level of professional service which CQS have provided in the difficult circumstances of this project, ultimately costing over £3m. For a charitable trust such as ours, wholly dependent on grant funding, the pricing of construction work has been of the essence. CQS have been forced by events to revisit the pricing issues several times during the six years to enable the project to be completed within the level of grant- funding secured. To that end Alwyn Williams built up an excellent relationship with the principal of the construction contractor, himself a qualified quantity surveyor, while still questioning his proposed figures, not least for the various extra pieces of work which were required. In particular, at a late stage it was found necessary to renew all the market stalls. The initial price proposed by the contractor was quite unaffordable but by virtue of a detailed analysis of all its cost components was reduced very substantially and the stalls were successfully installed.

Howard Swynant

| Cardigan Preservation Trust

Case Study Indepth

See our complete interactive case study below on the Cardigan Market Hall Redevelopment project.